For the recurring owner–architect–contractor discussion, use the OAC meeting agenda and blank action record to connect unresolved information with procurement and delivery follow-up, pair it with the weekly construction project coordination checklist for subcontractor lookaheads, MEP sleeve sign-offs, curtain wall embed surveys, and tower crane hook-time control, and close out field execution with the post-construction cleaning, punch list, and turnover checklist.

Before releasing a fabrication package, use the shop drawing review and field-dimension checklist to compare tolerances, disclose specification deviations and resolve VIF dimensions.

Technical workflow diagram of CSI 01 74 23 three-phase post-construction cleaning, HVAC MERV 13 filter swap, and 48-to-72-hour dust settle window
Planning October 25, 2026 27 min read

Post-Construction Cleaning & Closeout Checklist: 3-Phase Turnover, Surface Chemistry, Punch List & O&M Handover

Execute 3-phase post construction cleaning (CSI 01 74 23), prevent architectural glass and stone chemical damage, clear the AIA A201 §9.8 substantial completion punch list, and hand over O&M manuals and G704/G706/G707 closeout records.

Read article: Post-Construction Cleaning & Closeout Checklist: 3-Phase Turnover, Surface Chemistry, Punch List & O&M Handover