<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title>Muros Construction</title><description>Construction and wall-system notes for builders comparing structure, finishes, and on-site sequencing.</description><link>https://www.murosconstruction.com/</link><language>en</language><item><title>Concrete Test Cylinders vs Mix Design Submittals: ASTM C31 Curing, 28-Day Breaks, and ACI 318 Acceptance</title><link>https://www.murosconstruction.com/articles/concrete-test-cylinders-vs-mix-submittal/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/concrete-test-cylinders-vs-mix-submittal/</guid><description>Separate pre-pour concrete mix design submittals, ready-mix delivery tickets, and concrete test cylinders across curing, break testing, and acceptance.</description><pubDate>Sat, 07 Nov 2026 00:00:00 GMT</pubDate><category>Planning</category><category>concrete test cylinders</category><category>material test reports</category><category>concrete mix design</category><category>quality control</category></item><item><title>Mill Test Report (MTR) and Steel Heat Number Traceability: Chemical, Mechanical, and Gate Verification</title><link>https://www.murosconstruction.com/articles/mill-test-report-heat-number-traceability/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/mill-test-report-heat-number-traceability/</guid><description>Review a mill test report alongside steel heat-number identification, chemical and mechanical results, certificate type, and fabrication records.</description><pubDate>Thu, 29 Oct 2026 00:00:00 GMT</pubDate><category>Sourcing</category><category>mill test report</category><category>steel traceability</category><category>material receiving</category></item><item><title>Construction Submittal Register and Action Codes: CSI 01 33 00 Tracking and PO Release Gates</title><link>https://www.murosconstruction.com/articles/construction-submittal-register-action-codes/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/construction-submittal-register-action-codes/</guid><description>Build a CSI 01 33 00 submittal register from Part 1 specifications, separate action and informational submittals, and verify NET, MCN, and R&amp;R PO release gates.</description><pubDate>Wed, 28 Oct 2026 00:00:00 GMT</pubDate><category>Procurement</category><category>construction submittal</category><category>submittal register</category><category>submittals</category><category>purchase order</category><category>specifications</category></item><item><title>Shop Drawings in Construction: Fabrication Tolerances, Specification Deviations, and AIA A201 Review</title><link>https://www.murosconstruction.com/articles/shop-drawings-review-tolerances-specification-deviations/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/shop-drawings-review-tolerances-specification-deviations/</guid><description>Review shop drawings against contract requirements, check fabrication and field tolerances, document specification deviations, and resolve VIF dimensions.</description><pubDate>Tue, 27 Oct 2026 00:00:00 GMT</pubDate><category>Planning</category><category>shop drawings</category><category>specifications</category><category>construction coordination</category></item><item><title>Construction Project Coordination Checklist: Weekly Subcontractor, MEP, Curtain Wall &amp; Crane Control</title><link>https://www.murosconstruction.com/articles/construction-project-coordination-checklist/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/construction-project-coordination-checklist/</guid><description>Run weekly construction project coordination across GC and subcontractor lookaheads, MEP sleeve and firestop sign-offs, curtain wall embed surveys, tower crane hook-time slots, and long-lead rigging.</description><pubDate>Sun, 25 Oct 2026 00:00:00 GMT</pubDate><category>Planning</category><category>construction project coordination</category><category>construction site coordination</category><category>construction site management plan</category><category>subcontractor coordination</category><category>site logistics</category></item><item><title>Post-Construction Cleaning &amp; Closeout Checklist: 3-Phase Turnover, Surface Chemistry, Punch List &amp; O&amp;M Handover</title><link>https://www.murosconstruction.com/articles/post-construction-turnover-and-closeout/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/post-construction-turnover-and-closeout/</guid><description>Execute 3-phase post construction cleaning (CSI 01 74 23), prevent architectural glass and stone chemical damage, clear the AIA A201 §9.8 substantial completion punch list, and hand over O&amp;M manuals and G704/G706/G707 closeout records.</description><pubDate>Sun, 25 Oct 2026 00:00:00 GMT</pubDate><category>Planning</category><category>post construction cleaning</category><category>construction closeout checklist</category><category>substantial completion punch list</category><category>CSI 01 74 23</category><category>project turnover</category></item><item><title>AIA Contract Documents: A Procurement Form Guide</title><link>https://www.murosconstruction.com/articles/aia-contract-documents-procurement-guide/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/aia-contract-documents-procurement-guide/</guid><description>Match A101, A102, A104, A133, A141, A201, and A401 to the price clause and the delivery route before the wrong general conditions are incorporated.</description><pubDate>Tue, 20 Oct 2026 00:00:00 GMT</pubDate><category>Procurement</category><category>aia contract documents</category><category>construction procurement methods</category><category>construction contract types</category></item><item><title>Construction Material Budgeting Template: CSI Codes, Waste and Escalation</title><link>https://www.murosconstruction.com/articles/construction-material-budgeting-template/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/construction-material-budgeting-template/</guid><description>Copy a construction budgeting template that separates CSI division coding, net and order quantities, waste allowance, price evidence and escalation terms.</description><pubDate>Mon, 19 Oct 2026 00:00:00 GMT</pubDate><category>Market Notes</category><category>construction budgeting template</category><category>material budgeting</category><category>CSI division coding</category><category>waste allowance</category><category>escalation</category></item><item><title>Special Inspections in Construction: A Material Handoff Worksheet</title><link>https://www.murosconstruction.com/articles/special-inspections-construction/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/special-inspections-construction/</guid><description>Separate construction QC from required special inspections, then use a material-package worksheet to coordinate documents, access, reports and closeout.</description><pubDate>Mon, 19 Oct 2026 00:00:00 GMT</pubDate><category>Planning</category><category>special inspections construction</category><category>material handoff</category><category>quality control</category><category>inspection coordination</category></item><item><title>How to Choose Construction Material Procurement Software: A Demo Worksheet</title><link>https://www.murosconstruction.com/articles/procurement-software-selection-criteria/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/procurement-software-selection-criteria/</guid><description>Evaluate construction material procurement software with a blank five-test vendor demo worksheet covering submittal revisions, PO release, split deliveries, damaged receipts and CSV export.</description><pubDate>Sat, 17 Oct 2026 00:00:00 GMT</pubDate><category>Procurement</category><category>procurement software</category><category>material procurement</category><category>purchase order</category><category>submittals</category><category>vendor evaluation</category></item><item><title>PCO in Construction: From Material Change to Order Release</title><link>https://www.murosconstruction.com/articles/bulletins-pcos-change-orders/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/bulletins-pcos-change-orders/</guid><description>Understand construction PCO terms, distinguish bulletins from change orders, and use a blank record to connect material revisions to order-release authority.</description><pubDate>Thu, 15 Oct 2026 00:00:00 GMT</pubDate><category>Planning</category><category>potential change order</category><category>material changes</category><category>material procurement</category><category>site coordination</category></item><item><title>Construction Site Management Plan</title><link>https://www.murosconstruction.com/articles/construction-site-management-plan/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/construction-site-management-plan/</guid><description>Record work tasks, sequence, and resource types in a construction site management plan, plus a blank material-readiness row. Durations and costs stay empty.</description><pubDate>Wed, 14 Oct 2026 00:00:00 GMT</pubDate><category>Planning</category><category>construction site management plan</category><category>construction site procedures</category><category>construction site organization</category></item><item><title>Construction Manager at Risk: When the Price Is Set</title><link>https://www.murosconstruction.com/articles/construction-manager-at-risk/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/construction-manager-at-risk/</guid><description>A construction manager at risk advises during design, then builds under a price ceiling. When that price is set, what it includes, and who awards the trades.</description><pubDate>Tue, 13 Oct 2026 00:00:00 GMT</pubDate><category>Procurement</category><category>construction manager at risk</category><category>guaranteed maximum price</category><category>preconstruction services</category></item><item><title>Construction Procurement Methods Compared: How to Choose the Right Route</title><link>https://www.murosconstruction.com/articles/construction-procurement-methods/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/construction-procurement-methods/</guid><description>How design-bid-build, design-build, management contracting and CM/GC split design, price and overlap, and why five-method lists disagree.</description><pubDate>Mon, 12 Oct 2026 00:00:00 GMT</pubDate><category>Procurement</category><category>construction procurement methods</category><category>design-bid-build</category><category>design-build</category><category>construction manager general contractor</category></item><item><title>Construction Material Procurement Log Template</title><link>https://www.murosconstruction.com/articles/material-procurement-log-template/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/material-procurement-log-template/</guid><description>Download a blank construction material procurement log and PO field sheet (CSV), with field definitions, a backward scheduling method and no assumed lead times.</description><pubDate>Sun, 11 Oct 2026 00:00:00 GMT</pubDate><category>Procurement</category><category>procurement log</category><category>material procurement schedule</category><category>purchase order</category><category>submittals</category><category>templates</category></item><item><title>Contingency in Construction: Types, Uses and How to Set It</title><link>https://www.murosconstruction.com/articles/contingency-in-construction/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/contingency-in-construction/</guid><description>What construction contingency covers, how it differs from allowances, escalation and reserves, and how to size it from a risk register, with a worked example.</description><pubDate>Sat, 10 Oct 2026 00:00:00 GMT</pubDate><category>Market Notes</category><category>contingency in construction</category><category>construction cost estimating</category><category>risk in construction</category><category>material cost risk</category></item><item><title>Construction Quality Control Checklist: A Blank Template</title><link>https://www.murosconstruction.com/articles/construction-quality-control-checklist/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/construction-quality-control-checklist/</guid><description>Use stage-by-stage construction QC checks, material receipt prompts and a copyable blank template to record requirements, findings, evidence and sign-off.</description><pubDate>Fri, 09 Oct 2026 00:00:00 GMT</pubDate><category>Planning</category><category>construction quality control checklist</category><category>material receiving</category><category>construction inspection</category><category>quality records</category></item><item><title>Construction Quality Control Plan: ITPs and a Blank Template</title><link>https://www.murosconstruction.com/articles/construction-quality-control-plan/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/construction-quality-control-plan/</guid><description>Build a construction QC plan around responsibilities, DFOWs, ITPs, material receipt and release records. Copy the blank fields into your project documents.</description><pubDate>Thu, 08 Oct 2026 00:00:00 GMT</pubDate><category>Planning</category><category>construction quality control</category><category>quality control plan</category><category>inspection and test plan</category><category>material receiving</category></item><item><title>OAC Meetings: Agenda, Roles and Follow-Up</title><link>https://www.murosconstruction.com/articles/oac-meeting-construction/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/oac-meeting-construction/</guid><description>Run a construction OAC meeting with a focused agenda, clear roles and a blank action record connecting submittals, ordering decisions and delivery dates.</description><pubDate>Wed, 07 Oct 2026 00:00:00 GMT</pubDate><category>Planning</category><category>project controls</category><category>site coordination</category><category>material procurement</category><category>meeting records</category></item><item><title>Construction Material Procurement: Lifecycle Stages, Sourcing Channels and Verification Checklist</title><link>https://www.murosconstruction.com/articles/construction-material-procurement-process/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/construction-material-procurement-process/</guid><description>Five release gates for construction material procurement, plus sourcing channels and a verification checklist. Cost share, waste, lead time, markup, and attic stock stay blank unless a saved source prints them.</description><pubDate>Tue, 06 Oct 2026 00:00:00 GMT</pubDate><category>Procurement</category><category>construction procurement</category><category>material procurement</category><category>purchasing</category><category>supply chain</category><category>bid leveling</category></item><item><title>How to Evaluate a Building Material Supplier Before Placing a First Order</title><link>https://www.murosconstruction.com/articles/how-to-evaluate-a-supplier/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/how-to-evaluate-a-supplier/</guid><description>A first order from a seller with the wrong plant address can be rejected or arrive damaged. Name the seller and the plant, and leave credit score, lead time, and payment split blank.</description><pubDate>Thu, 20 Aug 2026 00:00:00 GMT</pubDate><category>Sourcing</category><category>supplier evaluation</category><category>supplier qualification</category><category>quality</category><category>order verification</category></item><item><title>Specification Comparison Guide for Building Materials</title><link>https://www.murosconstruction.com/articles/specification-comparison-guide/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/specification-comparison-guide/</guid><description>A catalog match can still be rejected once the material is installed. Line up the test method, the edition, and the result, and leave any unprinted figure blank.</description><pubDate>Fri, 14 Aug 2026 00:00:00 GMT</pubDate><category>Buying Guides</category><category>specifications</category><category>product comparison</category><category>materials</category><category>submittal review</category></item><item><title>Construction Site Coordination Notes</title><link>https://www.murosconstruction.com/articles/site-coordination-notes/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/site-coordination-notes/</guid><description>Work that follows a drawing after the specification has changed can be rejected at the contractor&apos;s expense. Construction site coordination notes record the drawing set on the work site, the superintendent who can act, and the storage clearances before material is set down.</description><pubDate>Mon, 10 Aug 2026 00:00:00 GMT</pubDate><category>Planning</category><category>jobsite logistics</category><category>site coordination</category><category>specifications</category><category>materials</category></item><item><title>First-Order Risk Checklist for Commercial Construction Buyers</title><link>https://www.murosconstruction.com/articles/first-order-risk-checklist/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/first-order-risk-checklist/</guid><description>Choose construction material procurement requirements for a first order: freeze the drawing revision, name the Incoterms 2020 rule, and copy only figures a saved official page or the project file prints.</description><pubDate>Fri, 07 Aug 2026 00:00:00 GMT</pubDate><category>Procurement</category><category>risk management</category><category>first order</category><category>supplier qualification</category><category>order verification</category></item><item><title>Better Walls Begin with Better Questions: A Comprehensive Wall-System Briefing Guide</title><link>https://www.murosconstruction.com/articles/wall-system-planning/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/wall-system-planning/</guid><description>A closed wall hides leakage the brief never assigned. Record the pressure band, the cavity, and the joint before comparing wall-system proposals.</description><pubDate>Sat, 01 Aug 2026 00:00:00 GMT</pubDate><category>Planning</category><category>wall-systems</category><category>building envelope</category><category>specifications</category><category>materials</category></item><item><title>When a Lower Unit Price Costs More: The Total Installed Cost Model in Building Procurement</title><link>https://www.murosconstruction.com/articles/when-a-lower-unit-price-costs-more/</link><guid isPermaLink="true">https://www.murosconstruction.com/articles/when-a-lower-unit-price-costs-more/</guid><description>A lower material unit price can lose to waste, framing, labor, and closed-wall rework. Compare total installed cost on one scope, and keep unprinted prices blank.</description><pubDate>Tue, 28 Jul 2026 00:00:00 GMT</pubDate><category>Market Notes</category><category>total cost</category><category>purchasing</category><category>landed cost</category><category>materials</category></item></channel></rss>